
Installation of the System
Steps
7
Difficulty
2/5

First, we fixed the charge controller in such a way that it is easy to reach

Next we screwed a wooden board into the interior as base

Thanks to the base, we can now screw the blackbox onto the board

To fix the batteries we built a frame and use clamps


For the potentiometer we simply replaced the old throttle

The last step was to leave all cables tidy and connect all the built-in technologies. For that you can simply use the 2d-model from chapter 1 Our System